Facility
State-Of-The-Art Wastewater Treatment Facility
US Water Recovery’s state-of-the-art wastewater treatment plant in Goose Creek, SC recycles more than 400,000 gallons of non-hazardous wastewater every month, with the capacity to process up to 1,000,000 gallons a month. We use advanced technologies in the treatment and management of wastewater for effective recovery and reuse.
Our centralized wastewater treatment facility combined with our vacuum trucks, vacuum tankers, air movers and more gives us the ability to handle a wide range of wastewater treatment services for several different industries.
US Water Recovery is licensed by the state of South Carolina as a physical/chemical wastewater pretreatment facility meeting stringent EPA standards. Safety and regulation is our number one priority, and we are committed to streamlining the wastewater management process while improving your bottom line.
The Process
Before we accept wastewater, we require that prospective clients complete a Waste Material Profile form, a Business Credit Application and submit a waste material sample for analysis. Our SCDHEC-certified laboratory will then analyze your sample. If we can accept your wastewater, upon arrival to our facility, it will be tested against this profile to make sure it corresponds before being discharged into our tanks.
Wastewater is treated with physical and chemical methods, removing metals, solids, and oil from the water. After the clean water is discharged into the POTW, the oil is recycled by a processor and the solids are sent to a local landfill for energy reuses.